
Prepare the box with drainage and ventilation holes
Drill the base with 6-8 holes of 8 mm (0.31 in), spaced about 8 cm (3.1 in) apart. On the long sides make 2 rows of 4 holes, 5 cm (2 in) from the top edge, so there is contact with the damp soil. The lid has 4 holes of 6 mm (0.24 in), so it can breathe without getting soaked.








