
Dig out and lay the base logs
Mark a 200×100 cm (39.4 in) rectangle and dig about 15 cm (5.9 in) deep, keeping the soil to one side. Lay the logs lengthways, piling them higher in the centre (about 25 cm, 9.8 in above the ground) and lower at the edges, to give a mound shape. Hardwood logs, such as oak or olive, take longer to break down than soft pine. If you soak them well beforehand, they will hold more water.







