
Cut the IBC down to a usable height and fit the drain with a valve
Remove the metal cage and cut the IBC horizontally at 40 cm (15.7 in) high, wearing gloves and goggles. Drill through one side at 5 cm (2 in) from the bottom and fit the 1-inch ball valve. Set the tank with a slight tilt (about 2°) towards the valve, so the water drains out completely, and seal with neutral silicone.








