
Assemble the tray and add drainage
Put together the 50×35×15 cm (5.9 in) frame and fix the base. Drill 8–12 holes of Ø 8–10 mm (0.31–0.39 in) in the bottom, spread out: the excess water has to drain away. Sand the sharp edges. Optional: line the bottom with mesh so the growing medium does not escape.






