
Set up the box sloping towards the exit
Raise one end by about 15 cm (5.9 in), which gives a slope of about 15°: the liquid drains to the low end, where you can drill an outlet hole or put in an absorbent sponge. The higher, drier area is for the larvae to pupate in. Fit the ramp from the middle towards the outer tub.






